Alright guys!
I am getting some bites from contractors who are interested in helping supply tools and materials... Here are some questions they have had for me and how to respond to them:
Do you have access to a truck and some labor to get items to your warehouse?
I don't know if anyone in studio has a truck. I seen to remember asking and getting a no. If I need to, when the time comes, I'll rent one from Lowe's. As far as the labor goes, that's us!
Any chance of giving us some PR if we donate a good portion of your wish list?
Certain. We will do press release. I know we will get considerable local media attention. News 13 has already covered beginning of Jamie's project. Additionally, we will include our donors on a permanent plaque for each of the container projects. Both city and county departments are involved directly or in a peripheral way with our project and we will certainly mention names there as well. I imagine that we will do a class and Community photo with the project and send that along with a thank you letter to our important donors. This will be great marketing material for contractors.
Have you thought about contact West Orange Tech - I think they have several construction classes and perhaps your projects would give them life experience and free labor to your project?
Great idea. We will do this!
Showing posts with label Materials. Show all posts
Showing posts with label Materials. Show all posts
Wednesday, February 15, 2017
Sunday, January 22, 2017
Task 1&2: Information and Mock Up
TASK 1: INFORMATION
Materials Need List
01/20/2017
For Algae Façade
- Water
- Algae
- Glass Panels
- Steel Metal Frame
- Tubing for Algae Nutrients
- Bracket with Thermal Breaks
- Algae Nutrients
For Glass Circle Façade
- Thick glass circle panel with hollow center
- Circular Metal Frame
- Steel Tube
For Pallet Façade
- Corrugated Metal Sheets
- Hinges
Manufacturers
01/20/2017
Need:
-Glass Manufacture
-Hollow Metal Frame Manufacture
-Steel Manufacture
Steel
1. Alro Metals Outlet (called, can pick up material for
1-5$)
a. 1101 Oak Lane, Winter Springs FL 32708
b. (407) 678-2576
Algae
1. https://www.buyalgae.com/product-category/algae/
2. http://www.carolina.com/algae/green-algae-ac-living/FAM_151955.pr?question=
Algae Food
1. http://www.carolina.com/living-organisms/protists/algae/10635.ct?N=2666129721&Nf=pro
duct.startDate%7CLTEQ+1.4848704E12%7C%7Cproduct.cbsLowPrice%7CGT+0.0&Nr=
&nore=y
Glass
1. Keating Glass Corporation (emailed so far)
a. 1717 S. Division Ave, Orlando, FL 32805
b. 407-425-5913
Detail Examples
Hallow metal frame with glazing detail
Step by Step
Instructions
This video shows a guy creating a fish tank out of glass
panels and silicone. Dry time takes 3 days
https://www.youtube.com/watch?v=ui-r2oTfTog
This shows how to weld metal steel tubing into frames
https://www.youtube.com/watch?v=h8aMW3l4Wj0
DIY alage to biofuel
https://www.youtube.com/watch?v=YuuDPsoRaNM
---Needs for successful cultivation
https://www.youtube.com/watch?v=jTImYag6h_k
-Appropriate light saturation point (varies based on
algae type)
-Optimal temperature level (more important when
cultivation is outdoors
-All cells must receive the same average light exposure
-More CO2 than is what found in the atmosphere must be
added to the culture (they also need nitrous, silicone, and phosphorous)
Quantum fracturing
And
Transesterification process
(fatty acid mixed with alcohol, catalyzed with
a hydroxide to create sodium ethanoate which transforms into glycerol and 3 methyl
esters (aka biofuel))
TASK
2: MOCK UP
1. Scale
The main concern with choosing a scale for the
algae façade is determining the depth between the glass panels that is
acceptable for algae growth. The panels from the precedence appear to be
between 1”-1.5” max. Since this is such a small dimension to begin with, I would
propose rather than changing the scale, just create (at full scale) a small portion
of the full panel. About 10” by 12”
2. Method
1.
Collect materials
2.
Cut glass panels to correct size
3.
Attach glass panels to the metal frame
4.
Weld or bolt metal frames together
5.
Fill with water and algae
3. Drawings
4. Materials
1.Glass Panels
2. Metal Frame
3. Sealant
4. Spacer
5. Hollow Pipe
6. Tubing for nutrients
7. Welding Materials
8. Water
9. Algae
10. Algae Food
11. Air pump
5. Tools
1.
Welding equipment
2.
Tape
3.
Glass cutter
4.
Metal cutter
6. Precedents
By: Splitterwerk
Architects and engineering firm Arup
Location: Hamburg, Germany
Description: “dubbed the BIQ, has a "bio-adaptive" facade that is
claimed to be a first for using algae within its glass-paneled facades in order
to generate energy, and provide shade, to a working building”
http://newatlas.com/algae-powered-building/27118/
Subscribe to:
Posts (Atom)




