MOCK UP
Process Sketches
Working out thoughts about materiality, configuration, and mechanical assemblies
Frame
The first panel is attached to the frame and a secondary hinge is added to the base of the panel to allow for movement of second panel
Photo of the hinge attached at the header in action
Second panel is attached to middle hinge
Photo of the movement made possible by way of two hinges attached to original frame
Closer look at the second hinge at center between two panels
A rail is added to the frame to keep the panels movement restricted to the vertical
A closer look at the detail for the rail. This concept failed for the first mock up and needs to be worked out for another iteration to successfully holds the panels rigidly to the vertical axis and not allow for movement away from the frame
Pulley system is then added to allow for proper mechanization of the mock up.
Pulley system in use
Pulley system utilized as panels approach full range of motion
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.